Restoration of Restrooms at Laurensberg School Complex, 2019
Refurbishment and redesign



Refurbishment of the boys' WC facilities on the first floor and second floor.
The floors were finished with an epoxy resin coating.
The wall panels—made of HPL laminate at the bottom—were spray-painted by graffiti artists and then given a final coat of paint, in consultation with the students and school administration. In
developing the design and color scheme, emphasis was placed on creating a look that would appeal to the students. The goal of this particularly colorful
and eye-catching design is to gain widespread acceptance among the students and thereby prevent potential vandalism.

