Façade greening and open space redesign Musikbunker 2025

Ground-based façade greening and enhancement of the surroundings


This project has been completed.
Raised beds were arranged on the bunker forecourt to beautify and cozy up the urban space.


Occasion and goal

As part of the "Zukunft Forst" urban development process to make the district areas in Forst more attractive and liveable, the upgrading of the bunker and its surroundings was a key concern of local residents.

In this context, the building management was commissioned to plan the greening of the façade in the direction of Zeppelinstraße, including the redesign of the bunker's forecourt.

Four multi-stem trees will soon dominate the forecourt design in addition to the extensive greenery on the façade.
Four multi-stem trees will soon dominate the forecourt design in addition to the extensive greenery on the façade.


Facade greening as a pilot project

For the first time, the city of Aachen has implemented ground-based façade greening on a public building.

Benches
Benches


Planning and parties involved

The planning was carried out by the Building Management, Sustainable Building Department in cooperation with E18 and with the involvement of the tenant Musikverein and the Forst steering group.

External advice on the vegetation and maintenance concept was provided by building greening planner and ecologist Nils van Steenis.

Group photo




Plant selection: 560 plants from 15 species

The basis for greening is a varied and biodiverse selection of plants.

  • Climbing plants: climbing hydrangea, wild vine
  • Accompanying greenery: ground cover, perennials, solitary shrubs such as rock pear, snowball, blood plum
  • Raised beds: with robust perennials such as sage, coneflower and autumn anemone
Planting in the bed and on the façade
Planting in the bed and on the façade


Redesign of the open space

The overall package of environmental improvements includes

  • Creation of recreational areas on the forecourt of the bunker using raised beds with wooden seats
  • Installation of an electricity and water connection for use at neighborhood festivals, etc.
  • Illumination of the façade greenery via ground spotlights to reduce anxiety zones (implementation with support from the Lichtverein and Regionetz)
  • Moving the glass containers to a more inconspicuous location
Floor lights make the unique façade visible in the evening
Floor lights make the unique façade visible in the evening.
Enough space has been preserved so that neighborhood festivals can take place on the forecourt.
Enough space has been preserved so that neighborhood festivals can take place on the forecourt.


Maintenance and costs

The building management takes care of watering, maintenance and pruning. The electricity and water costs are borne by the neighborhood management.

Implementation will take place in fall 2025.
The cost of the greening - excluding lighting and maintenance - is around €37,000.

Water and electricity are used to irrigate the green area and are available for neighborhood festivals.
Water and electricity are used to irrigate the green area and are available for neighborhood festivals.


  • Construction site photos

    During the construction work, the flowerbed edging will be installed.
    During the construction work, the flowerbed edging will be installed.
    Earthworks and replacement of the drainage pipes in need of repair
    Earthworks and replacement of the drainage pipes in need of repair


Help with accessibility

  • General

    We make every effort to ensure that our websites are accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement using our"Report a barrier" feedback form.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    ⌘command
    +

    Smaller

    ⌘command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    ⌃control
    ⌥option
    ⌘command
    .

    Decrease

    ⌃control
    ⌥option
    ⌘command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press left ALT + left SHIFT + PRINT to quickly switch the high contrast mode on or off.

  • Invert colors

    Press the following key combination to switch the color inversion on and off:

    ⌃control
    ⌥option
    ⌘command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the color inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colors

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    ⌥option
    ⌘command
    8

    Enlarge view

    ⌥option
    ⌘command
    =

    Reduce view

    ⌥option
    ⌘command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Reduce view