Renovation work on the Kornelimünsterweg bridge
Aachen's municipal services are having part of the Kornelimünsterweg bridge repaired. Parts of the asphalt surface of the structure, which is located between the Meiselhof and Forsthaus Schönthal parking lots, are damaged. Parts of the roadway, other bridge components and the connecting areas are therefore being repaired.
The work will be carried out from Monday, July 14 until probably Friday, July 18. Traffic will be regulated by traffic lights. The above-mentioned parking spaces will remain accessible.
In view of the poor condition of the road surface, it is imperative that the asphalt is repaired at this point in time and cannot be postponed. This is the only way to guarantee that road safety is maintained for all road users on the Kornelimünsterweg bridge.
You can subscribe to our RSS feed for our press releases here https://www.aachen.de/rss-feed-pressemitteilungen/rss.xml