Camp Hitfeld development plan and land use plan

Brief info

  • Project: Preparation of a development plan and amendment of the FNP 1980 Camp Hitfeld between A44, Augustinerwald, Augustinerweg and Hitfelder Straße
  • Location: Aachen-Mitte and Kornelimünster / Walheim districts in the area between Augustinerwald, Augustinerweg and Hitfelder Straße
  • Size: approx. 22 ha.
  • Planned use: ground-mounted photovoltaic system
  • Project phase: early participation

Map

Process status

Early participation of the authorities and the public from 27.02. to 09.03.2012

Explanations on planning

For a section of the former Camp Hitfeld military site (Gabrielle Petit), the legal planning requirements for the use of the site as an open-space photovoltaic plant are to be created. This conversion area is to be designated or depicted as an area for utility facilities with the purpose of generating electricity from renewable energies.

Note on the provision of information on the Internet

In accordance with Section 4a (4) BauGB, the possibilities offered by electronic information technology are hereby additionally utilized by publication on the Internet.

Download

Contact us

No employees found.

Help with accessibility

  • General

    We make every effort to ensure that our websites are accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement using our"Report a barrier" feedback form.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements and buttons.

    Use ENTER to open links and interact with elements.