Cancellation of development plan no. 534 - An den Wurmquellen

Brief info

  • Project: Cancellation of development plan no. 534 -An den Wurmquellen-
  • Location: Aachen-Mitte district in the area between Eupener Straße, Grindelweg, the rear property boundaries of the 'An den Wurmquellen' development and Zweiweiherweg
  • Size: 4.9 ha.
  • Planned use: The abolition of development plan no. 534 -An den Wurmquellen- is intended to keep the currently undeveloped areas free and preserve the cold air corridor. No further residential development is to be permitted on these areas.
  • Current project phase: early participation

Map

Process status

The Planning Committee (PLA) has decided to carry out early public participation in accordance with Section 3 (1) of the German Building Code. Consultation date: PLA: 23.09.2021
Early public participation: 08.04.2024 - 10.05.2024 (exhibition of the plans) and 11.04.2024 (hearing date)

Explanations on planning

Note: Parallel to this revocation procedure, alignment plan no. 373, which makes stipulations for the same plan area, is to be revoked.

Development plan no. 534 "An den Wurmquellen", which became legally binding on 01.05.1966, was drawn up to amend and supplement alignment plan no. 373. The development plan essentially contains stipulations regarding the type and extent of building use as well as public traffic areas. The alignment plan no. 373 already specifies, among other things, a public traffic area between Diepenbenden and Grindelweg. This planned public traffic area is not necessary from today's urban planning perspective. The areas that are still undeveloped today, but which are included in the development plan as areas that can be built on, should continue to be kept free and the cold air corridor should be preserved. Both plans are to be revoked as their objectives are outdated and should not be pursued any further. In a separate procedure, a new development plan is to be drawn up for the plan area following the repeal of alignment plan no. 373 and development plan no. 534. The urban planning objectives were already adapted to the current situation in 2021 with the resolution A 173.

Note on the provision of information on the Internet

In accordance with Section 4a (4) BauGB, the possibilities of electronic information technology are hereby utilized in addition by publication on the Internet. The representations on the Internet are non-binding.

Download

Contact us

No employees found.

Help with accessibility

  • General

    We make every effort to ensure that our websites are accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement using our"Report a barrier" feedback form.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements and buttons.

    Use ENTER to open links and interact with elements.